欢迎访问林草资源研究

FOREST RESOURCES WANAGEMENT ›› 2015›› Issue (1): 11-16.doi: 10.13466/j.cnki.lyzygl.2015.01.002

• Integrated Management and Administration • Previous Articles     Next Articles

Scheme Design and Main Result Analysis of The Fouth National Survey on Giant Pandas

TANG Xiaoping1, JIA Jiansheng2, WANG Zhichen1, ZHANG Dehui2, YU Baocheng1, YU Jianbing1, Gong Minghao3, LIU Yang1   

  1. 1.Academy of Forest Inventory and planning,SFA,Beijing 100714,China;
    2. Department of Wild Fauna and Flora Conservation and Nature Reserve Management,SFA,Beijing 100714,China;
    3.Wetland Institute,Chinese Academy of Forestry,Beijing 100091,China
  • Online:2015-02-28 Published:2020-12-01

Abstract: In order to meet the needs of giant panda conservation and management,the State Forestry Administration conducted the Fourth National Survey on Giant Pandas from 2011 to 2014.The survey covers seven aspects,including wild population,habitats,sympatric animals,disturbance,conservation and management,social economic conditions of distribution areas and captive population.We obtain overall information on giant pandas.This article describes the technical scheme in The Fourth Survey,it shows some of the main survey results and analyses the main dynamic changes since the end of the Third Survey.

Key words: survey on giant pandas, technical scheme, rate of wild giant panda conservation

CLC Number: